Dec 7 – 8, 2022
Australia/Perth timezone

Session

Engineering & Operations

eng
Dec 7, 2022, 11:10 AM

Presentation materials

There are no materials yet.

  1. Randall Wayth, Yajun Wu
    12/7/22, 11:10 AM
    Engineering and Operations
  2. Greg Sleap (Curtin University/Murchison Widefield Array)
    12/7/22, 11:30 AM
    Engineering and Operations

    In this presentation, I will provide an update on the MWA's data archive, MWA ASVO and the implementation of the data retention policy.

    Go to contribution page
  3. Luke Williams (CIRA)
    12/7/22, 11:40 AM
    Engineering and Operations

    Fringe stopping prior to cross-correlation allows longer visibility integration times without introducing de-correlation, which in turn allows the size of the correlator output products to be substantially reduced. The new correlator for the MWA, "MWAX", was designed from the outset to include pre-correlation fringe stopping. However, it was not supported in the first operational release and...

    Go to contribution page
Building timetable...