7–8 Dec 2022
Australia/Perth timezone

Session

Engineering & Operations

eng
7 Dec 2022, 11:10

Presentation materials

There are no materials yet.

  1. Randall Wayth, Yajun Wu
    07/12/2022, 11:10
    Engineering and Operations
  2. Greg Sleap (Curtin University/Murchison Widefield Array)
    07/12/2022, 11:30
    Engineering and Operations

    In this presentation, I will provide an update on the MWA's data archive, MWA ASVO and the implementation of the data retention policy.

    Go to contribution page
  3. Luke Williams (CIRA)
    07/12/2022, 11:40
    Engineering and Operations

    Fringe stopping prior to cross-correlation allows longer visibility integration times without introducing de-correlation, which in turn allows the size of the correlator output products to be substantially reduced. The new correlator for the MWA, "MWAX", was designed from the outset to include pre-correlation fringe stopping. However, it was not supported in the first operational release and...

    Go to contribution page
Building timetable...