Aug 28 – 30, 2024
BC Building, Swiss Federal Institute of Technology Lausanne (EPFL)
Europe/Zurich timezone

The status of SHAO-MWA Ph3 receiver

Aug 28, 2024, 4:40 PM
20m
BC01 (level 0) (BC Building, Swiss Federal Institute of Technology Lausanne (EPFL))

BC01 (level 0)

BC Building, Swiss Federal Institute of Technology Lausanne (EPFL)

Rte Cantonale, 1015 Lausanne, Switzerland
Presentation Engineering and Operations Engineering and Operations

Speaker

Yajun Wu (Shanghai Astronomical Observatory)

Description

The Shanghai Observatory of China(SHAO) and MWA have collaborated on the development of Phase III digital receivers. The on-site installation of the prototype has been completed and observation testing is currently underway. This report will introduce the functional requirements, hardware and software design, related test results of this digital receiver. And some other digital backends based on this will be reported , including broadband pulsar terminals and spectral line backend, as well as preliminary observation results.

Primary author

Yajun Wu (Shanghai Astronomical Observatory)

Presentation materials